Whether you are in the Gantt view or the Grid view of the Scheduling Planner, the process of cloning an individual shift is the same.
1) While in the Scheduling Planner, hover your mouse over the shift you want to clone.
2) Click on the three dots that appear on the right side of the shift.
3) Click "Clone."
4) Repeat Shift Every: Click the boxes to select which days to copy this shift onto.
5) "What Should We Do With (Team Member)":
Only Assign to Open, Existing Shifts - If there are upcoming shifts that match the criteria of team AND time of the shift, Prospr will assign the user to those open shifts. Prospr will not create additional, blank shifts.
If Possible, Assign to Existing Shifts - If there are upcoming shifts that match the criteria of team AND time of the shift, Prospr will assign the user to those open shifts. - Always Create New Shifts - Prospr will create brand new shifts while cloning. If there are existing shifts that match the team and time criteria, they will not be filled by the team member.
6) Click "Apply".